Wednesday, March 23, 2011

Yellowish Teething Gums

RENEWABLE ENERGY CLASS A: As part of the discussion of a future biofuel energy matrix

GOVERNMENT
looking restudy definition of renewable energy in the country
  • From the industry say is necessary to include the hydroelectric dam in the name.
  • The framework for the discussion of future energy matrix

Although the government does not recognize it, sources in the energy sector and ensure that the Executive would be working to refine a few points to the Electric Utility Law 20,257 which is included in the non-conventional renewable energy (URE), which has been applied widely in the growing clean energy industry.

pass approaches, for example, by removing the term "unconventional" so as not to exclude, to the hydroelectric dam, or raise the ceiling for the designation of mini hydroelectric plants, which currently is 20 MW and 100 MW seek leave, according to what the president had committed to the CPC Piñera.
consulted by the theme, Energy and Mining biministro, Laurence Golborne, said yesterday that the conversation must go beyond clean energy, then the discussion should focus on the possibilities to provide, in next 10 or 20 years, the energy that the country will require according to their economic growth.
this line and in relation to the alternative of modifying some points of law which includes NCRE argued that "there is no bill in that direction yet, has not been presented, many initiatives are under consideration. But beyond that, what matters is to have a much wider discussion about the energy issue." He added that it is an issue that requires debate, "but the issue does not go through or not the MW set to establish renewable energy." Golborne
during his presentation to the Committee on Senate Energy and Mining said that by the year 2020 by law in the country Shall have 8% of the matrix on the basis of URE, which does not conflict with the goal of 20/20, because that was always regarded as an aspiration. "Generate 15,000 MW in 9 years of renewable energy in the current conditions and without major subsidies, it is not possible by 2020," he said.
Request
industry
industry requirements are those that have a long time.
Tinguiririca general manager of Energy, Claudio Montes said that "it is very important to make some changes because, by setting a limit of 20 MW power plant in passing, is not considered as renewable energy as the central Higuera and The Confluence, which are recognized worldwide as such. "
Energy's general manager, Maria Isabel Gonzalez said" the limit is arbitrary and goes against the efficiency as basins with potential of generating greater than 40 MW could be underutilized wasting their potential. On the other hand, other countries, particularly in Europe the limit is set at 200 MW.
This idea is validated by the general manager of Pacific Hydro, Jose Antonio Valdes, who said that "creates inefficient use water potential and energy inefficiency, which leads to greater social cost.

Source:
SEE, THINK, WRITE . Greetings
Rodrigo González Fernández
Diploma in Corporate Social Responsibility "UN
Diploma in Knowledge Management" UN
Diploma in Management UN in Public Administration
  • can read us FACEBOOK IN
http://www.facebook.com/ #! / profile.php? id = 1020328166
  • Siguenos and twitter: @ rogofe47
    www.consultajuridica.blogspot. com
    www.el-observatorio-politico.blogspot.com
    www.lobbyingchile.blogspot.com
    www.calentamientoglobalchile.blogspot.com
    www.respsoem2.blogspot.com
www.coachingdechile.blogspot.com
www.chile-renovables.blogspot.com
CEL: 93934521
Santiago-Chile
Apply our training courses and consulting in PUBLIC ADMINISTRATION MANAGEMENT-LEADERSHIP - KNOWLEDGE MANAGEMENT - CORPORATE SOCIAL RESPONSIBILITY - LOBBY - BUSINESS COACHING-RENEWABLE, consulting nationally and internationally and are available for OTEC Y OTIC in Chile

0 comments:

Post a Comment